Our client, a logistics company, needed to quickly add extra storage capacity and acquired a nearby 400,000 sq. ft. warehouse. As the two buildings would be operated and managed as a single business unit, it made sense to extend the existing network. However, due to time constraints, a dedicated MPLS circuit was not a viable option, typically taking 90 days or more due to wayleave issues or civic involvement. Fibre wasn’t an option either because there was no route available. Therefore, we were asked to come up with a solution that guaranteed a minimum of 1Gbps full duplex connectivity between the two buildings.